• Home
  • Projects
  • BENY Project | Enabling Reliable Air-Cooling Energy Storage in Lithuania

BENY Project | Enabling Reliable Air-Cooling Energy Storage in Lithuania

BYHV-115SAC 50 kW / 115 kWh air-cooling ess Lithuania

BENY supported the installation of 50 kW / 115 kWh Air-Cooling Energy Storage Systems in Lithuania for commercial and industrial applications, helping enhance power stability and enable flexible energy storage deployment.

The solution adopts an all-in-one cabinet design with system energy efficiency of ≥90%, IP55 protection, and C3 anti-corrosion performance. Designed to operate reliably from –20°C to +55°C, it ensures stable operation and simplified system integration.

This project highlights BENY’s capability in supporting standardized and reliable energy storage deployment in Europe, contributing to safer, more durable, and long-term energy infrastructure development.

Wonderful! Share this Case:

This is What I Need, Contact to Customize.

Tell Us About Your Upcoming Project






    Talk to Our Expert